The unit must remain in an upright position for at least 12 hours before initial commissioning or after transportation. Check the power cable, plug, and the unit itself for any damage. If you discover any damage, report it immediately to customer service and do not operate the unit under any circumstances.

When installing the unit, please follow the instructions provided in the user manual. Store and operate the unit in a well-ventilated room that meets the minimum room size specified for operation.


Only use original accessories and spare parts. Place the air conditioner on a stable, level, and dry surface. Keep cables, plugs, and electrical components away from water and other liquids.

The air inlet and outlet must not be blocked.

The air conditioner must not be used in potentially explosive environments. Clean the air filter regularly according to the instructions in the user manual. Children, persons with reduced physical, sensory, or mental capabilities, and pets should be supervised while the air conditioner is in operation.

Do not operate the air conditioner in rooms where chemicals or gases are released, or near open flames or other ignition sources.

Extension cords, power strips, and adapters must not be used.



If you have any further questions that have not been answered, no problem! We will be glad to help you: Contact ecofort.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article